四象限工作法顺序
中文版 | English
You are here : Home > Value acquired by customer
Customer-oriented is the core value of EnTech Mold. The customer is not only receiving our mould and product, but also precious value, which could be reflected in quality, timing, design, engineering, manufacturing and cost control.

Quality Control:
        1. Communicate with customer in depth to fully understand customer’s requirement.
        2. Feasibility studying (Mould Flow Analysis, etc)
        3. Assure the high quality design (2D&3D)
        4. Strictly control manufacturing quality
        5. Strictly inspect of trial out sample
        6. Strict Inspection in dimension and specification before shipment of mould.

Time Control:
        1. Working out a reasonable schedule for project and propelling concurrent engineering technique, which will remarkably improve the efficiency of manufacturing.
        2. Quick response to the problem during manufacturing and solve it timely.
        3. Quick response to the Engineering Change Notice.

Design Control:
        1. There is a pre-design meeting among manufacturing dept., project dept. and design dept. to work out the best solution for mould making.
        2. 25 mould designers can finish the design tasks efficiently.
        3. Every 2D/3D design will be approved by general design manager who have profound experience in mould making and injection material industry. 
        4. The design will be presented and fully communicated with customer to secure customer's final approval.

Engineering and Manufacturing Control:
        1. Senior engineer will conduct the detailed analysis of the math data and comprehend customer's requirement and pass to design and manufacturing department.
        2. Senior engineer offers professional suggestion to design dept. after comprehensive analysis of mould and injection material, remarkably enhance the design quality. 
        3. Utilizing the top facilities to process the mould to reach high precision and high quality.
        4. The qualified operators will remarkably reduce any wrong practices to guarantee the quality of mould.
        5. Senior engineer will give the best solution to problem arising during the production.
        6. If the process is out of schedule, the ERP system will give warning automatically, the responsible person will take immediate action to correct it.  

Cost Control:
        1. Senior engineer shall provide the optimized solution to save cost for the customers by assuring the quality of our products.
        2. Enhance the supply chain management and monitor the material price closely, bring benefit to customer timely.
        3. Strengthen the internal management to minimize the overhead expenses.
Site Map - Contact us   Copyright ? 2011EnTech Mold Manufacturing (Shenzhen) Ltd. All Rights Reserved.|粵ICP備17090597號-3
四象限工作法顺序 竞彩网比分直播新浪 4847王中王铁算开奖结果小说 南宁牌封胡怎么算 手机北京快3 开奖结果 快乐12开奖结果辽 湖北新11选5 青海省十一选五开奖 今天福彩36选7好彩1 手机北京麻将下载 微乐河南麻将怎么玩 河北快三今天走试图 陕西11选5分析预测 排列五机选号码 河北20选5 微乐吉林棋牌官方下载 美人捕鱼